Housing New Zealand

Our specific approach for this project has been to target ease, flexibility and speed of construction

 

 

 

This is paramount with regards to HNZC as we are both less impacted by adverse weather, and less time on site reduces the risk of construction hazards. In addition, by manufacturing “in house” we are able to control quality better, reduce material wastage and react quickly to any changes in the programme demand. Stanley Construction managed the entire process from design, consenting and construction through to obtaining compliance.

Our specific approach for this project has been to target ease, flexibility and speed of construction. This has allowed us to exploit our manufacturing capabilities to their full potential, while our fully collaborative design ethos extracts maximum benefit from the Design and Build contract model. 

 

 

Furthermore, these manufacturing capabilities have been streamlined on a lean manufacturing model in order to ensure minimal wastage, minimal handling of materials, high levels of repetition and robust quality assurance procedures. Basically we look for savings at every conceivable step in the process albeit it through "bulk buying", re-engineering "wastage" to become useable product, or simply by careful scheduling to ensure efficient transport logistics.  

Project Details